Twelve years of making things that hang on buildings.

S2 Sign Solutions began as one plotter in a small unit on Fort Campbell Boulevard. It is now a full studio: designers, fabricators, printers and installers working from the same floor.

Mission

Give every local business a physical presence that matches the quality of what they actually do.

Vision

To be the studio Western Kentucky calls first when a brand needs to exist in the real world.

Timeline

How the shop grew.

  1. 2013

    A single vinyl plotter

    Mohammad Danish starts cutting decals for neighbouring businesses on Fort Campbell Blvd.

  2. 2016

    First fabrication shop

    Metal forming and channel letter production move in-house.

  3. 2019

    Large-format print

    UV flatbed and roll-to-roll printing added, opening up wraps and murals.

  4. 2022

    Install division

    Own crews, lifts and licensed electrical connection end the reliance on subcontractors.

  5. 2025

    Design studio

    A dedicated design team formalises the branding-first approach the shop was already known for.

Core values

Four things we refuse to compromise.

01

Craft over volume

We would rather build forty signs properly than four hundred carelessly.

02

Straight answers

Honest lead times, honest pricing, and an early call when something changes.

03

Local accountability

We live here. Our work is on the roads we drive every day.

04

Design-led thinking

Every project starts with the brand, not with the catalogue page.

UV flatbed printer running full colour graphics inside the S2 production facility
Production facility

Machines we own, not machines we book.

CNC routing, metal forming, welding, powder coat prep, UV flatbed and roll-to-roll printing, LED assembly and a dedicated finishing bay.

0+
Signs fabricated & installed
0
Services under one roof
0 yrs
Serving Western Kentucky
0%
Clients who return
Team

The people on your project.

Mohammad Danish

Founder & Principal

Runs every survey and quote personally. Twelve years of fabrication judgement behind each number.

Renee Alcott

Design Director

Leads concept development, renders and brand translation across every project.

Travis Boone

Fabrication Lead

Metal forming, welding and finishing. Keeps tolerances tighter than the drawings require.

Marcus Iyer

Install Superintendent

Schedules crews, lifts and permits so install days are boring in the best way.

Community

Local work, local commitment.

We donate signage to Hopkinsville school programmes, sponsor youth sports banners and provide free ADA compliance reviews for nonprofit facilities in Christian County. Every crew member lives within twenty miles of the shop.

S2 installation crew fitting large dimensional letters at golden hour

Quality commitment

If it leaves our floor with our name on it, we stand behind it.

Multi-year workmanship warranty on fabrication, manufacturer coverage on electrical components, documented QC at every station, and a photographic close-out record for every installation we complete.

Come see the floor.

Book a showroom visit and we will walk you through materials, finishes and live projects.